December 20, 2007
Front Drainage Improved

   

Pass-through holes are cut
Drain is set to collect roof runoff
along front (south) dripline

New 2x4s are mounted alongside original ceiling joists to provide level support for drywalling.
PVC pipes will guide drainage around west side to a sump at northwest
corner of building

Pass-through holes are cut

Trench is cut for pipe to feed drain water into
wooded area at north end of the property


Return to Old School House Transformation Diary