August 11, 2008
Front Doorway Finished

   

Interior door casing is fitted in place.
Interior door casing is fitted in place.

Exterior casing added after gaps are stuffed with insulation.
Exterior casing added after gaps are stuffed with insulation.

Pilaster sills are returned and aluminum threshold installed.
Pilaster sills are returned and
aluminum threshold installed.

New baseboard trim finishes pilasters.
New baseboard trim finishes
pilasters.

Old porch lantern is refinished and returned to its place.
Old porch lantern is refinished and returned to its place.

Address numerals are added.
Address numerals are added.

The Old School banner sign is refreshed and remounted.
The Old School banner sign is refreshed and remounted.

Electric door assist, emergency lights and exit sign are wired in.
Electric door assist, emergency lights and exit sign are wired in.