August 5, 2008
Main Stairway Installed

   

Single-piece welded-metal staircase is propped in place from upper floor to mid-upper landing and anchored to upper floor joists.
Single-piece welded-metal staircase is propped in place from upper floor to mid-upper landing and anchored to upper floor joists.

Stair-tread panels of laminated rough-sawn oak 2x4 stock are cut to length.
Stair-tread panels of laminated
rough-sawn oak 2x4 stock are
cut to length.

Cabinet is installed in wall opening.
Wood tread panels are fitted
onto metal staircase.

Metal staircase leading from main-floor vestibule to mid-lower landing is held in position by hoist from upper staircase.
Metal staircase leading from main-floor vestibule to mid-lower landing is held in position by hoist from upper staircase.

Lower staircase is anchored to mid-lower landing framework.
Lower staircase is anchored to mid-lower landing framework.

Wood stair treads are secured with screws drilled in from staircase underside.
Wood stair treads are secured with screws drilled in from staircase underside.

Laminated oak deck is fitted onto mid-lower landing framework.
Laminated oak deck is fitted onto
mid-lower landing framework.

View down from top floor landing shows staircase nearly completed.
View down from top floor landing shows staircase nearly completed.


Return to Old School House Transformation Diary