July 31, 2008
Main Floor Flooring Laid

   

Cleanup removes drywall residues, nails, other surface irregularities.
Cleanup removes drywall residues, nails, other surface irregularities.

Tracks are installed for later glass wall installation at front entrances
Tracks are installed for later glass wall installation at front entrances.

Rough-sawn oak floorboards are cut to length outside.
Rough-sawn oak floorboards are
cut to length outside.

Cut lengths are fitted together, nailed down in west room.
Cut lengths are fitted together, nailed down in west room.

Floor electrical boxes are raised to finish height.
Floor electrical boxes are raised to finish height.

Floorboards are fitted around glass-wall tracks.
Floorboards are fitted around
glass-wall tracks.

Flooring advances into the rear pass-through hallway.
Flooring advances into the rear
pass-through hallway.

Installation continues toward the east room outside wall.
Installation continues toward the east room outside wall.

Dirt and scuff marks are hand-sanded out, flooring is vacuumed and covered with paper for protection during subsequent work.
Dirt and scuff marks are hand-sanded out, flooring is
vacuumed and covered with paper for protection
during subsequent work.