July 24, 2008
Front Walk and Porch Forms Built

   

Porch forms are set up first.
Porch forms are set up first.

Lawn is graded for walkway.
Lawn is graded for walkway.

Walkway and rotunda forms are built.
Walkway & rotunda forms are built.

Trench for 4" pipe will allow future utility access to rotunda center opening.
Trench for 4" pipe will allow future utility access to rotunda center opening.

Universal Access ramp from driveway is added.
Universal Access ramp from
driveway is added.

Pipe trenched in under ramp will allow utility pass-through later.
Pipe trenched in under ramp will
allow utility pass-through later.